prefabricated industrial commercial steel frame broiler chicken house for sale
Light Steel Construction For Poultry Farm
When we recommend tight poultry house ,we are not only recommending poultry house type which is installed faster,actually we are recommending a closed poultry rearing condition. As we know,what does a closed poultry rearing condition mean for farmers?That means a poultry rearing condition which is easier to control and manage than open and half-open poultry house. When the poultry rearing condition is not affected by the weather outside,that will mean more stable profits,lower rearing risk and lower energy cost. So we meticulous design details of REGER tight poultry house for production of tighter and higher cost-effective poultry house
Features
1. Single-span steel construction from 12m to 20m or more |
2. Fit for floor raising, cage raising, double-storey house |
3. Design based on wind load and snow load |
4. Main structure like truss, beam, purlin and opening framework is high strength steel |
5. Wall insulation R value R12 (2.11 K·m²/W),ceiling R value R18(3.17K·m²/W) |
6. Tight structure, energy-saving |
7. Main structure economical, 10-11KG/M2 |
What information the client is supposed to offer before making quotation ?
1. Climate condition of farm locaiton ( highest temperature and lowest temperature in one year ,Relative humidity )
2. What is your land size for the farm ( length and width )?
3. What kind of birds do you plan to raise and how many birds in one house ? ( if broiler pls tell us the slaughter weigth of chikcen )
4. Wind load of farm location city .
5. If you have your mind on house size , pls let us know it .
FAQ :
1. Q:Can you supply a complete solution for us ?
A:Of course , our technican team covers broiler poultry system on the ground and in cage ,breeder , layers cage system , Ducks /goose system , hog , pigeon /quail , and steel structure house design .
2.Q:What the client should prepare for Installation ?
A: Besides land and fund , Firstly ,clients shall make sure that elelctricity and water supply is ok before equipment installation . Secondly Clients shall order some concrete for house foundation when house stallation .Thirdly , Clients shall make the land for farm construction flat before house installation and employ an work team to assistant our engineer . Other things will be finished on our side .
3. Q: Do you offer guid installation on site overseas ?
A: We will sent you our detail installation drawings . if you need , we sent our engineer or our installation team on sit to do the service of installation.